Crane joint hoisting is not only the greatest challenge confronting crane operators, but also the severest test of each crane. We can often see dozens of cranes working together to install the large steel structures and net racks. Many hoisting professionals say such hoisting must have two basic qualifications.
I. The crane performance should be 100% reliable; II. The operator should have great proficiency.
Case 1: building a steel-structure workshop
Products: two our 25t cranes
Key words: safety and efficiency
Case 2: Install the roof of toll gate in Shaanxi
Products: eight units of our cranes ranging from 25t to 70t
Key words: stability
Case 3: hoist in a shipyard in Chongqing
Products: four units of our 25t and 50t cranes
Key words: continuous and intensive operation
Case 4: install roof of a gas station in Anhui
Products: four cranes of XCT20L5, QY25K5 and 20B.5
Key words: micro-motion
The above four cases are most-common working conditions of joint hoisting by a few cranes. Relying on the ability of super-strong and continuous operations and precise micro-motion of the our cranes, they realize the safe and efficient hoisting operations, making us the priority choice in the hoisting field.
Contact Person: Ms. Zhao
Tel: 0086-516-66676223
Fax: 86-516-80296064